51 Crystal Ave – House Renovation Update

Last time I showed you our property on Crystal Ave in Springfield it was being gutted down to the studs.

It is now nearly complete and we will be putting it on the market shortly. This house was a full gut and we are doing new everything… roof, siding, windows, mechanicals, kitchen, bathrooms, floors, third floor expansion, driveway…. you get the picture; everything.

It’s definitely going to be the best house on the street by far. It’s in a part of the city that we don’t do alot of houses in, so selling something in this area will be a new experience for us.

I just realized right now that I never put up any before pics of this house… only some demo pics. So I’m going to post some before pics here. This house was really nasty and you’ll get a sense as to why we chose to do a full gut. I will also post some pics I took of the house from last week as we are getting close to finishing.

Here are the before pics;

51 Crystal Ave Springfield MA Before

Kitchen pic 1

Kitchen pic 2

Hallway leading into Kitchen

Dining Room

Living Room with Spooky writing on the wall

Weird Fake Fireplace in Living Room

First Floor Half Bath

Second Floor Full Bath

Bedroom

Third Floor Attic

Some houses you walk into, take a look around, realize that there isn’t anything worth saving, and you just say “OK, lets gut it”. This was one of them….

Now time for some pictures that are a little more pretty. We removed quite a few walls from the first floor to give this house a great open floor plan.

51 Crystal Ave Springfield MA

Crystal Ave Springfield MA house for sale

New Kitchen Cabinets being installed

Kitchen Breakfast Bar looking into Dining Room

View of Living and Dining Room with Walls Removed

Dining Room

Living Room

View from Front Door looking into Kitchen, Living room and Dining Room

A look at the Staircase leading to 2nd Floor

Check out the Nice Stained Glass Window

Converted 3rd Floor Space

Third Floor Space

View looking down the Stairs from the 3rd floor loft

The converted third floor is coming out very cool. We moved and rebuilt the staircase going up there and made it all open…. almost like a loft. This space could be used as a fourth bedroom, office, den, etc…..

Allright, so this one should be finishing up within a few days. We will stage it and get it for sale. I’ll post some pics of the fully rehabbed house when we’re done.

-Happy Flipping!!

107 Granger St – Finished and Staged

107 Granger, Springfield MA Before

We’ve finished up our rehab of 107 Granger St in Springfield and the house is officially for sale.

This one came out real nice. This is the first house we went with a little darker cherry cabinet to go along with our black granite and full stainless steel appliance package. It came out great and will probably be our new standard going forward.

The rehab of this property was pretty straightforward. We expanded and converted the breezeway into living space, finished the basement, added a third bedroom, installed a new furnace and water heater, installed new plumbing, installed a new roof, gutted and redid the kitchen and bathrooms, knocked out a bunch of walls, and generally made the house look awesome!!!!

I’ve made a couple posts about this property. You can see the before pics HERE, the demo video HERE and the house all gutted HERE.

Now have a look at the finished product:

107 Granger St Springfield House for sale

107 Granger St Springfield MA

House for sale Granger St Springfield MA

Houe for Sale Springfield MA

Call Now to buy this Home!!!

Kitchen

107 Granger St Kitchen

Damn this is a Nice Kitchen!!

Breezeway Addition/Conversion

New Dining Area in Converted Breezeway

Heres where we Knocked out a Bunch of Walls

Open Floor Plan

Living Room

New View from Living Room into Kitchen

107 Granger St House for Sale Springfield MA

Bathroom

Shower Panel with Body Jets

Living Room

Bedroom

107 Granger St Finished Basement

Finished Basement

Third Bedroom

Third Bedroom Granger St Springfield MA

I think the house looks real sweet. Now all we need is a new family to make it their home.

-Happy Flipping!!

Longmeadow Rehab Video

Here is the video walkthrough we did of our new Longmeadow rehab on Fernleaf Ave. In this video our workers are stripping the cement tile roof and we outline our interior plans for the renovation.

You can get an idea of just how big this house is from the opening scene.

This house is gonna look awesome when we’re done with it!!

Fernleaf Ave Longmeadow

-Happy Flipping

New Construction Rehab – 9 Juliette St Chicopee

We’ve finished the renovation work at our almost new construction house on Juliette St in Chicopee. This was a pretty easy job as the house is probably less than 2 years old.

The builder didn’t finish quite a few things and overall the quality of the finish work was pretty poor, so we went in and did some “redecorating”. We painted the whole interior, installed granite in the kitchen and added really high end Samsung stainless steel appliances, finished the 2 bathrooms, re-tiled some floors, added new hardwoods throughout the house, patched some walls, repoured some concrete, and landscaped the property.

We staged the house and put it on the market.

Here’s the finished product; (you can see all the before pictures HERE)

9 Juliette St Chicopee MA

View of Kitchen from Dining Area

Kitchen

Kitchen

Kitchen

Great Room/Dining Area

New Bamboo Hardwood Flooring

Master Bedroom

Master Bathroom

Full Bath 2

Basement

New House Flip – Longmeadow Rehab

Wow….I just realized it’s been over 10 days since my last post. Looks like I’m falling behind here, Sorry!

We are pushing right along, wrapping up quite a few projects and starting some new ones.

One new house that I’m really excited about is our new Longmeadow rehab project located on Fernleaf Ave. We bought this house a few weeks back and have started the work. This is gonna be a big job given the size of the house and all the work that needs to be done. The house is 6 bedrooms and 3 full baths with over 2,500 square feet. It’s not as big as our Historic House on Bowdoin St in Springfield,  and isn’t going to require nearly as much work, but because it’s in Longmeadow we are going to have to do a bit more of a high end rehab.

Our plan is to gut the kitchen and all the bathrooms, do new plumbing and electric, add a new roof, patch and paint the exterior stucco, install a new driveway, knock out a whole bunch of walls to open the floorplan up, remove an underground oil tank, and pretty much redo every surface in the house.

I’ve got a bunch of before pictures, so check it out;

Fernleaf Ave Longmeadow MA

Fernleaf Ave Longmeadow

Rear of Fernleaf

Garage and Driveway

Main Hallway/Foyer

Living Room with Smelly Carpet

Living Room pic 2

Kitchen Pic 1

Kitchen Pic 2

Dining Room

Dining Room with Built Ins

Second Floor Bath

Second Floor Bedroom

Second Floor Bedroom

Third Floor Bath

Third Floor Bedroom

First Floor Bath

Basement

So thats the house. Its very dated inside and has alot of deferred maintenance.  The roof has a layer of moss so thick that you can’t even see the shingles anymore!!

We did a video walk-through of this one that I need to edit and will post so you can see the house and what our plans are for the renovation.

Stay Tuned!!!!

Dorothy Ave Sold, Fullerton St Interior Update

35 Dorothy Ave Chicopee MA complete

We sold our 35 Dorothy Ave rehab on Monday. This was a short sale that we purchased back at the end of April/early May. The rehab was pretty easy and took just under 30 days. We put the house on the market in June and got an offer in 1 day! The biggest challenge we had with this deal was in working with the new buyers lender. They wouldn’t waive the 90 day FHA seasoning requirements so we had to wait the 90 days to sign the P&S and to be able to close. This cost us a little bit of time but it wasn’t too bad.

All in all this was a really smooth deal, even the short sale negotiations to purchase the house went real quick.

You can see the before pictures HERE and the after pictures HERE.

Now onto an interior update for 64 Fullerton St.

64 Fullerton St Springfield MA

In my last post I showed you how the house looked inside after we had gutted it out. Well I took some more recent photos of the interior as we are starting the finish work there. All the sheetrock is up, everything is painted, and we are starting down the home stretch.

Here’s how she looks:

Kitchen looking from main hallway

Kitchen looking from Dining Room

Living Room

Dining Room

Bathroom

Tub waiting to be Tiled

Bedroom

Pretty soon this one will be done, then it’s time to stage it and bring it to the market!

House Flip Update: 64 Fullerton St

The 64 Fullerton St project is moving right along.

We had to do quite a bit of yard work and tree removal to this property. There were a number of large trees surrounding the house, yard and garage that we removed. You can see some of them in the pictures below:

64 Fullerton with Trees

Trees overhanging Fullerton

Trees on Garage

Our landscaper and contractor spent a long weekend playing Lumberjack and took them all down. It really makes a big difference…. check out the pictures below:

Fullerton with trees gone

64 Fullerton St Springfield MA

Lots of Fire Wood

All Clear

Stumps from Trees

The majority of the exterior work is now done. Along with the tree removal we put in a new driveway, sided and roofed the garage, tore off the addition on the garage, and added some new garage doors.

Here’s how it looked yesterday when I was at the house.

64 Fullerton Exterior Nearly Complete

64 Fullerton St

We didn’t have to do siding or a roof on the main house, we were able to just powerwash it and put some new shutters on the house.

The inside is almost complete now too. Below are some photos of when we first gutted the house out and the plumbers and electricians were doing there rough ins. You can see all the before pictures HERE.

Living Room

Dining Room

Kitchen

New Half Bath Framed In

Master Bedroom

We should be finishing up the interior work on this one pretty soon so I’ll post some more pics as we wrap that up.

107 Granger St Update – Open it Up

Lots happening this week.

We finally sold our 8 Bosworth St rehab. This was suppose to close back on June 17th but we hit a couple delays with the buyers financing. We are also buying two new rehabs that I’ll write about in future posts.

Our 107 Granger St project is moving right along. We’ve got all the sheetrock up, everything is painted, the kitchen cabinets are in, and the plumber and electrician are starting their finish work.

Here are some photos of the changes we have made. (You can see the before pics HERE and the before video HERE)

107 Granger St Springfield

Above is a look at the outside with the new siding and new roof.

Here is a view of the kitchen looking in from the living room. We removed the wall that enclosed the stairs going down into the basement and we also removed the wall between the kitchen and living room.

Here is the view from the kitchen looking into the converted breezeway. We removed the exterior wall that separated the two rooms.

This is a look at the addition that we built off the back of the breezeway. By adding this extra space we were able to move the eat-in area out of the kitchen, which gave us room for more cabinets and appliances.

This is the view standing in the breezeway looking back into the kitchen and living room. By removing all those walls it really makes the floorplan much more open and functional.

Looking at the kitchen from the breezeway. We are now going to be able to run cabinets along most of this wall and fit our fridge.

Looking into the living room from the kitchen.

Here is the bathroom, which we expanded out a little to fit a larger vanity as well as a linen closet.

 

So there’s a look at some things you can do to open up a floorplan and make a small, boxy house alot more open and functional. It definitely is some extra work, but that’s what it takes to sell houses in this market!