Glenwood Fire Damage – an Upclose Look

Things are moving right along at the Glenwood St project. Last week we passed all our rough inspections and insulation inspection. This week the sheetrockers were there hanging drywall, taping and mudding. Next step is to paint and begin all our finish work.

I made a short video of the fire damage at this property. The fire started in the basement at the old electrical box and burnt up through to the first floor. Most of the damage was done in the basement to the floor joists and support beams, including the main support beam. Have a look:

I’ll show you how we fixed it in the next post…..

.

70 Glenwood Update

Work is well underway at Glenwood. We actually started renovations back in August before we even closed on the house.  After hitting quite a few delays in getting clear title we finally closed on the property last Friday. By the time we closed we had already put a new roof on the house, gutted the interior, reframed the interior, and replaced the fire damaged support beams, floor joists and half the first level floor. I wouldn’t recommend doing this much work prior to actually owning a property… we were definetly getting nervous as weeks went by and we still weren’t clear to close.

Heres a video from week 1:

37 Mansfield St– Fire Damaged Multi Rehab Update

We’ve made some slight changes over at the fire damage three family…. mainly we decided that it was no longer going to be a three family, we are converting it to a two family. The main reason behind this is because the city wanted us to do too many life/safety upgrades to the property that would have killed our budget. They were requiring us to either put a sprinkler system in, or install a fire alarm system complete with pull boxes, strobe lights, illuminated exit signs, beacons, and a fire panel that wirelessly called directly into the fire department. These are things you would generally find in a large office building or a 50-100 unit apartment complex…. not a dinky little three family located on a side road in Forest Park.

 The changes are actually going to work out pretty good. We had planned on holding this property as a rental, but now since it is only two units we are going to retail it. The value of the property actually doesn’t change that much, a two family is worth about the same as a three family, mainly due to the ease in which an owner occupant can buy a two family. A three family is much more difficult for an owner occupant to finance and an investor purchasing usually needs 20%-30% down thus limiting the pool of buyers and bringing the price of a three unit down.

It is now a very large two family with the second unit taking up two floors, kind of like a townhouse unit. The second floor unit will now be 6 bedrooms and 2 full baths…. it’s gonna be huge!

We’ve finished up the majority of the work on the outside. The inside is being sheetrocked. Heres a look;

102_5819

102_5821

102_5823

102_5827

102_5829

 

All the siding is complete along with the roof and the windows. The front porch was rebuilt and the side porch was taken down. Heres what it looked like before;

 

102_4985

102_4983

102_4987

102_4988

102_4990

  So the outside is looking real sharp. Now it’s just a matter of finishing up the sheetrock, painting, and completing all the finish work inside. Before you know it we’ll have this one on the market and under agreement!!!

Glenwood Pics

The property on Glenwood is another fire damaged home. It was being used as a two family prior to the fire, but because it is so small (for a two family) the best use is to convert it to a single family home.  We’ll be rearranging the floor plan a bit and making the house 4 bedrooms and 2 1/2 baths with a large finished attic space similiar to Hartford Terrace. The property is a full gut and we will be doing a new roof, some siding, new electric,new plumbing, new heating, new kitchen, new baths, etc…. The fire started in the basement and burnt up alot of the floor joists, sill plate and main support beams.  The owner of this property stopped by our fire damaged three family project and was impressed. He asked our contractor if we’d be interested in his house on Glenwood. We were out of town at the time but our contractor toured the property with the owner and gave us the green light.

Here are some pictures of the house in all it’s glory!!

102_5599

102_5625

102_5605

102_5606

102_5612

102_5614

102_5621

102_5622

102_5664

102_5665

102_5670

Video Update at the Fire Damaged Multi Family

Heres a video update from the fire damaged multi family that we are working on.  The outside is almost complete, inside all the rough is in so we are just waiting on inspections. Once inspections are complete we will begin insulating and than sheetrock. 

We’ve got a couple more rehabs under contract that we will be closing on in the coming weeks so be ready for some more great updates!!

Video Archives

I was digging through our video vault when I found this gem. It’s a video we put together a little over a month ago at the fire damaged three family we are working on.  It’s from the first day of work and you can see the property in more detail.

We’ve hit some snags at this property that has slowed us down a bit. First there was the stop work order, now the three building inspectors that have visited the site can’t seem to agree on the proper fire alarm/life safety system that we need. We can’t sheetrock and close up the walls till we know what type of fire alarm system we need to install. This all should be straightened out shortly and we will be ready for rough inspections and sheetrock!

Bessemer–Finishing Up

Work is almost complete at Bessemer St. We have started showing the property and have received very positive feedback… we actually may be getting two offers before the house even officially goes on the market.

The transformation of this property has been amazing and the finished product is looking great. Have a look at the house now:

102_5558

New Roof, Windows, Siding, Gutters, Garage Door, Landscaping, Etc...


New Kitchen w/Stainless Steel Appliances

New Kitchen w/Stainless Steel Appliances


102_5533

Tile Backsplash and Countertop. French Door Fridge. Lots of Recessed Lighting

 

Brushed Nickle Hardware, 18x18 Ceramic Tile Floor, Over the Range Microwave

Brushed Nickle Hardware, 18x18 Ceramic Tile Floor, Over the Range Microwave


First Floor Bathroom with New Fixtures and Ceramic Tile Floor

First Floor Bathroom with New Fixtures and Ceramic Tile Floor

 

Tile Tub Surround

Tile Tub Surround w/ Accent Border

 

Living Room w/ Fireplace and Hardwood Floors

Living Room w/ Fireplace and Hardwood Floors

 

Front Entrance/ Stairway

Front Entrance/ Stairway

 

Refinished Hardwoods

Refinished Hardwoods


Second Floor Bath

Second Floor Bath


Second Floor Bedroom

Second Floor Bedroom


Master Bedroom w/Front Load Washer/Dryer going in Second Floor Bath

Master Bedroom w/Front Load Washer/Dryer going in Second Floor Bath

 This one is turning out as nice as Hartford Terrace. Once it is completely finished and staged we should have buyers fighting over it.  We’ll be putting Bessemer and Brooks St on the market over the next week. I hope all the buyers aren’t on summer vacation and we can move both of these quickly.

Weekly Recap; plus We're in the News

Last week we stayed pretty busy. I met Bank of Americas appraisor at a short sale we are working on in Springfield. The meeting went well and I’m hoping we can get the value down to a low enough point that we can purchase the property. 

Our local paper, The Republican, did an article about our company and the project at Bessemer St.  The article ran last week and adds further credibilty to our business and gives us some positive media coverage. Here is the article:

 Hampden Homebuyers in the News

Wow, We’re Famous!!!!